Spiders, webs and dirt in close proximity - yuk! But, the pile fixings are all done, the zed nails are going in and the framing for the baseboards is albeit done.

The power is on, if even to only one power point. At least we don't have to lug the generator back and forth, and it's so much quieter.

New photos up on flicker show the baseboard framing, the new secondhand kitchen going in, the new deck out the back of the house complete and a preview of what the baseboards will look like. We've used 75 x 50 RAD H3 RS for the baseboard framing and the baseboards are 150 x 25 RAD H3 RS (radiata pine tanalised rough sawn).

The secondhand hot water cylinder has been fitted in to it's new purpose build cupboard. Behind which the new laundry has been stolen from the kitchen and will open in to the bathroom.

The back door leading to the new decking out the back, is undergoing repair. It's got a new sill and frame and has been rehung. The surrounding weatherboards still need to be fixed. Once this job is complete the rain will stop running in along the ceiling beam and that'll be the last drip stopped. 